- Sitemap - Chinese - English

Contact Us
Contact:Mr.Chen
Tel:0769-8805 6552
Fax:0769-8805 6550
Phone:13360489203
E-mail:info@globalgd.com / global_amy@126.COM
Q  Q:417901602
Address:Guancheng District, Dongguan City Wan Tai Road No. 5 XM Building, Room 507

Global Technical Service Co. Ltd
OFFICE Room 2103,21/F Ho King Commercial Centre, No. 2-16 Fa Yuen Street, Mong kok, Kowloon,HK
Tel:00852-30697929  
FAX:00852-6991 7688

PSE

Japan / PSE certification eligibility and process

PSE Certification qualification and process
 
PSE Certification applicant qualification
 
You must be a Japanese trading house registered with the Japanese government in order to apply for METI registration. If overseas manufacturers of specific product categories want to prevent the possible product sales problems caused by the need to change the agent when the agent is not cooperating well, they can buy more copies of the product when the product test passes “ Fitness equivalent inspection certificate ” In order for the new agent to register with METI.
 
PSE Certification Application process
 
1, determine whether it is a specific product item: you can find PSE product items (including A and B products) in the ProductList, if the product is not in the List, you do not need to apply. In addition, if the product is newly developed, it is best to determine whether the application is required by the designated Label.
 
2. Documents to be presented: (ForTestLab)
 
a, suitability of equal inspection application
 
b, type differentiation table: different products have different type differentiation table. The main purpose of this table is that when the model applied is a series of products, the test Lab needs to have this table in order to distinguish whether it can be combined into a series. The applicant shall fill in the type distinction form by himself, and the Lab of the test type shall determine whether it can be combined into a series of products. Taking PowerSupply as an example, different EI sizes (EI-41, 48OR57ETC, etc.) can also be combined into the same series, but different protection methods may not be combined into series products (Japanese).
 
c, structure, material and performance summary: the manufacturer should fill in the product characteristics in this form, and provide to the test unit.
 
d, relevant technical documents: Spec, (Transformer and complete products), instructions, Label, circuit diagram, PCBLayout and important parts list, etc.
 
e, inspection equipment list: manufacturers need to put forward a list of equipment in the factory, there is a fixed format for reference.
 
f, sample: 2PC, important parts (Fuse, ACOutlet, Case, etc., need to provide 1-5PC for replacement), etc.
 
g, CBCertificate& Report
 
h, authorization letter: authorized by the manufacturer to the Agency application.
 
I. Return form: When the Sample needs to be returned, this form needs to be filled in so that JET can return the sample to the correct person and unit.
 
3, a should submit documents: (ForMETI application for registration)
 
b, business commencement declaration: that is, the application for registration.
 
c, Factory login card
 
d, the suitability of the same inspection certificate (Class A products only need)orTestReport(Class B products): by LabIssue.
 
e, manufacturing process inspection records: factory records of the production process, from the preparation of materials, incoming samples and other procedures; There is no fixed format, but there must be.
 
f, Label: For details, see related materials.
 
4, factory inspection: If the factory does not have a factory login card, it must do factory inspection. Factory inspection is performed by Lab designated unit, currently JET designated unit is: Taiwan; Large power; The mainland CCIC.